Bangladesh bank has reduced Bank Rate from 5% p.a. to 4% p.a. In this regard, Bangladesh Bank issued a circular on 29th July 2020.
Sunday, 21 August 2016
RESTRICTION ON EXTENDING THE TERM TO MATURITY OF A TERM LOAN: BRPD Circular No. 15 dated September 23, 2012
The term to maturity of a term
loan may be extended subject to the following conditions and restrictions:
a) The loan must be performing ( Unclassified: Standard
or SMA )
b) The decision should be made at the level where the
loan was originally sanctioned
c) The maturity date may be extended by a period of time
not exceeding 25% of the current remaining time to maturity
SPECIAL CONDITIONS FOR LOAN RESCHEDULING. BRPD Circular No. 15 dated September 23, 2012
a) If
a loan account of an export-oriented garments industry or knit garments factory
becomes adversely classified due to stock lot, the loan may be rescheduled
without the required down payment. However, the sales/export proceeds from the
stock lot must be used to repay the loan. If any such loan account remains
unadjusted even after repaying the loan with sales/export proceeds of the stock
lot, the loan may be rescheduled without the required down payment based on
recovery probability and banker-customer relationship.
The
above mentioned facilities will not be applicable to forced loan, project loan
or term loan in this sector. Only such forced loans, which are backed up with
stock lot may avail such facilities. After rescheduling, new loan facility or
loan expansion application will be considered only after paying at least 7.5%
of the “Outstanding Balance”. New loan facility from other banks is subject to
the obtaining of NOC from the rescheduling bank.
b) If
a loan account of fertilizer importers becomes adversely classified due to
delay in government subsidy receipts and payment of subsidy bill, the loan may
be rescheduled without the required down payment. However, the receivable
government subsidy must be used to repay the loan. If any such loan account
remained unadjusted even after repaying the loan with a government subsidy, the
loan may be rescheduled without the required down payment on the basis of
recovery probability and banker-customer relationship.
c) For
rescheduling as above no prior approval of Bangladesh Bank will be required;
unless there is a requirement from Bangladesh Bank in the context of large loan
or related to the director of the bank.
CLASSIFICATION AND INTEREST SUSPENSE OF RESCHEDULED LOANS: BRPD Circular no. 15, dated September 23, 2012
Rescheduled
loans may be put into any category of classification by the bank considering
the existing financial soundness and repayment capacity of the borrower,
subject to the accumulated amount in interest suspense account not being taken
into income account, unless actually realized. Upon classification, applicable
provisions have to be maintained, according to the Master Circular: Loan Classification
and Provisioning (BRPD Circular No. 14/2012). These classifications will be
reviewed by Bangladesh Bank inspectors. However, regardless of the
classification category into which the loan is placed by the bank, a
rescheduled loan will not be considered a "defaulted loan," and the
borrower will not be considered a "defaulted borrower" as these terms
are understood in the context of section 27KaKa(3) [read with section 5(GaGa)]
of the Banking Companies Act, 1991, unless such loan has not been repaid after
reaching the maximum number of allowable reschedulings. Interest accrued on
rescheduled loans will be subject to the accounting treatment that is
appropriate for the classification category of the loan, in line with the
Master Circular: Loan Classification and Provisioning (BRPD Circular No.
14/2012) just as if the loan had not been rescheduled.
Thursday, 18 August 2016
Downpayment requierment for rescheduling in Bangladesh
As per BRPD circular no. 15, September 23, 2012, Down payment requirement for rescheduling is as under:
DOWN
PAYMENT OF TERM LOANS:
a) Application
for first time rescheduling will be taken into consideration upon receiving
cash payment of at least 15% of the overdue installments or 10% of the total
outstanding amount of loan, whichever is less;
b) Application
for second time rescheduling will be considered upon receiving cash payment of
minimum 30% of the overdue installments or 20% of the total outstanding amount
of loan, whichever is less.
c) Application
for rescheduling third time will be considered upon receiving cash payment of
minimum 50% of the overdue installments or 30% of the total outstanding amount
of loan, whichever is less.
d) The
rate of down payments for Short-term Agricultural and Micro-Credit will be same
as above.
Explanation:
If
any loan is rescheduled for one time before issuance of this circular, the
conditions set forth in this circular for second time rescheduling of such
loans shall be applicable. Likewise, the terms for third time rescheduling as
per this circular for rescheduling of any loan, which has already been
rescheduled twice or more shall be applicable.
DOWN PAYMENT OF DEMAND AND CONTINUOUS LOAN:
a)
If a Demand or Continuous Loan is converted
into a Term loan, first rescheduling may take place against down payment on the
basis of loan amount in the following manner.
|
Amount
of Overdue Loan
|
Rate
of Down payment
|
|
Up
to Tk.1.00 (one) crore
|
15%
|
|
Above
Tk.1.00(one) crore and up to Tk.5.00(five) crore
|
10%
(but not less than Tk.15.00 lac)
|
|
Above
Tk. 5.00(five) crore
|
5%
(but not less than Tk.50.00 lac)
|
Application
for rescheduling will be taken into consideration only after the amount for the
down payment is paid in cash as narrated in 01(c).
b) If
any Continuous or Demand Loan is rescheduled for the second time (first time
after being converted partly or wholly into Term Loan) and the repayment
installments are fixed, the application for rescheduling of such loans shall be
considered upon receiving cash payment of minimum 30% of the overdue
installments or 20% of the total outstanding amount of loan, whichever is less.
Similarly, for third rescheduling (second time after being converted partly or
wholly into Term Loan) minimum 50% of the overdue installments or 30% of the
total outstanding amount of loan, whichever is less, shall have to be repaid in
cash.
TIME LIMIT FOR RESCHEDULING: Ref. BRPD Circular no. 15 dated September 23, 2012
The rescheduling shall be for a
minimum reasonable period of time. Time limit for rescheduling of different
categories of loans will be as follows:
(Note:
These time limits are absolute maximums only, and banks are encouraged to
establish shorter time limits in their internal policies. Each loan that is
being considered for rescheduling should be evaluated on its own merits and not
automatically rescheduled for the maximum time period or rescheduled for the
maximum number of three (03) times.)
a) Time limit for
rescheduling Continuous Loan:
The loan account in which
transactions may be made within certain limit and have an expiry date for full
adjustment will be treated as Continuous Loan:
|
Frequency
|
Classified as Sub-standard
|
Classified as Doubtful
|
Classified as Bad/Loss
|
|
First Rescheduling
|
Maximum 18 (eighteen) months
from the date of rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
|
Second Rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
|
Third Rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of
|
Conditions: During the rescheduled
period all required principal and interest payments must be made. Rescheduled
amount should be repaid in monthly installments. If the amount of defaulted
installments is equal to the amount of 3(monthly) installments, the loan will
be classified as Bad/Loss.
b) Time limit for
rescheduling Demand Loan:
The loan which becomes repayable on
demand by the bank is treated as Demand Loan. If any contingent or any other
liabilities are turned to forced loan (i.e. without any prior approval as
regular loan) those too will be treated as Demand Loans:
|
Frequency
|
Classified as Sub-standard
|
Classified as Doubtful
|
Classified as Bad/Loss
|
|
First Rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
|
Second Rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
|
Third Rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Maximum 06 (six) months from
the date of rescheduling
|
Conditions: During the rescheduled period all required
principal and interest payments must be made. Rescheduled amount should be
repaid in monthly installments. If the amount of defaulted installments is
equal to the amount of 3(monthly) installments, the loan will be classified as
Bad/Loss.
c) Time limit for
rescheduling Fixed Term Loan:
The loan which is repayable within a specified time
period under a prescribed repayment schedule is treated as Term Loan.
|
Frequency
|
Classified as Sub-standard
|
Classified as Doubtful
|
Classified as Bad/Loss
|
|
First Rescheduling
|
Maximum 24 (twenty four)
months from the date of rescheduling
|
Maximum 18 (eighteen) months
from the date of rescheduling
|
Maximum 18 (eighteen) months
from the date of rescheduling
|
|
Second Rescheduling
|
Maximum 18 (eighteen) months
from the date of rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
|
Third Rescheduling
|
Maximum 12 (twelve) months
from the date of rescheduling
|
Maximum 09 (nine) months from
the date of rescheduling
|
Maximum 09 (nine) months from
the
|
Conditions: During the rescheduled period all required
principal and interest payments must be made. Rescheduled amount should be
repaid in monthly/quarterly installments. If the amount of defaulted
installments is equal to the amount of 6 monthly or 2 quarterly installments,
the loan will be classified as Bad/Loss.
d) Time limit for
rescheduling for Short-term Agricultural and Micro-Credit
|
First Rescheduling
|
Repayment time limit for
rescheduling should not exceed 2 (two) years from the date of rescheduling.
|
|
Second Rescheduling
|
Maximum 1(one) year from the
date of rescheduling.
|
|
Third Rescheduling
|
Maximum 6(six) months from
the date of rescheduling.
|
e) If the loan becomes default after third rescheduling,
the borrower will be treated as a habitual loan defaulter and the bank shall
not consider for further loan rescheduling.
f) Approval of loan rescheduling cannot be made below the
level at which it was originally sanctioned. A detailed appraisal report
including implications of such loan rescheduling on the income and other areas
of the bank must be placed to the approving authority at the time of placing
the rescheduling proposal.
Subscribe to:
Posts (Atom)
ONE Bank Ltd. Restored Salary of Employees effective from 1st January 2021
Salary/Benefits of ONE Bank Ltd. reverted back to its original amount before cutting the salary benefit in the year 2020. Due adverse affect...
-
THE UNIFORM RULES FOR BANK-TO-BANK REIMBURSEMENTS UNDER DOCUMENTARY CREDITS (URR 725) ICC UNIFORM RULES FOR BANK-TO BANK REIMBURSEMENTS (...
-
Rescheduled loans may be put into any category of classification by the bank considering the existing financial soundness and repaymen...
-
As per Bangladesh Bank BCD circular no 18 dated 27 th May 1984, Bangladesh Bank advised to follow the following guidelines: A. ...